What goes in an FF&E schedule

An FF&E schedule is a table with one line for every piece of furniture, fixture or equipment in a project. These are the 14 columns each line carries, a living-room example, and a free one-room sheet to print.

A plain PDF, free, no sign-up. US Letter, prints on A4.

What an FF&E schedule is

FF&E stands for furniture, fixtures and equipment: the pieces you buy and install, as opposed to the walls and floors. The schedule lists them by room, one per line, so that anyone looking at it can answer three questions: what is it, what does it cost, and when does it have to be ordered.

It is also where the arithmetic lives. Trade cost, markup, client price, deposit and order-by date sit side by side, so a change to one shows in the others.

The columns, item by item

Fourteen columns cover a piece from first proposal to delivery. Add or drop any of them; these are the ones the arithmetic needs.

  1. Item codeA short label by room and number: LR-01 is the first piece in the living room. It can go on a tear sheet and an order.
  2. RoomWhere the piece goes. Rooms are how the budget and the install are split.
  3. DescriptionThe piece in words you and the vendor both recognize: Sofa, Coffee table, Area rug, 9 x 12.
  4. VendorWho you order from. Grouped by vendor, the deposits you owe show up together.
  5. Finish and sizeThe fabric, wood and dimensions, so the order matches what the client approved.
  6. QuantityHow many. Every money column is for one piece; the line total is that times the quantity.
  7. RetailThe list price. Optional, but without it there is no trade discount and no client saving to work out.
  8. Trade costWhat you pay the vendor for one piece. Markup, margin and profit are all measured from it.
  9. Client priceWhat the client pays for one piece. Type it, or work it out from a markup or a saving off retail.
  10. Deposit and balanceWhat you owe the vendor up front, what you have paid, and what is left.
  11. Lead timeHow long the vendor says it takes to make or ship, in weeks, plus shipping days if they are counted separately.
  12. Needed byThe date the piece has to be in the room, for example the install date.
  13. Order byNeeded by, less the lead time, the shipping and a buffer for receiving and inspecting. The one date that decides when the order goes in; the order-by calculator on this site works it out.
  14. StatusProposed, approved, ordered, shipped or delivered. Sort by it to see what is still waiting for a yes.

A living-room example

Five pieces of one living room, with the example numbers from the calculators on this site. The install is March 15, 2027, with 7 days to receive and inspect; today is December 1, 2026.

Living room, five pieces
CodePieceVendorQtyTrade eachClient eachClient lineLeadOrder byStatus
LR-01SofaVendor A1$2,520.00$3,402.00$3,402.0012 weeks + 10 daysDecember 4, 2026Ordered
LR-02Coffee tableVendor B1$1,080.00$1,458.00$1,458.0010 weeks + 10 daysDecember 18, 2026Approved
LR-03Table lampVendor C2$270.00$400.00$800.003 weeks + 5 daysFebruary 10, 2027Proposed
LR-04Area rug, 9 x 12Vendor D1$2,080.00$2,880.00$2,880.006 weeks + 7 daysJanuary 18, 2027Approved
LR-05Drapery panelWorkroom4$310.00$403.00$1,612.008 weeks + 5 daysJanuary 6, 2027Ordered

Vendor names are made up. Every number here is an example. The sofa has the earliest order-by date of the five.

The free sheet has these five lines filled in as an example, and a blank page to fill in yourself. Download the one-room sample sheet (PDF).

Keeping cost off the client's copy

A schedule for your own use carries your trade cost and your profit. A client summary is a second page that shows only rooms, items, quantities and client prices.

Making it its own page, rather than hiding columns on the first, means a cost column cannot ride along by accident. In Room Ledger it is its own tab.

Free one-room sample sheet

One US Letter PDF, two pages. The first is the living-room example above, filled in and marked as an example. The second is the same sheet blank: 14 columns and 16 lines to fill in by hand for one room.

Arithmetic on your own numbers, not business, tax or legal advice. Every filled-in number is an example: change it to yours.